Case Studies

Underfloor Heating installation at new Gowerton Primary School

case-study-header.jpg

Underfloor Heating installation at new Gowerton Primary School

Designed and Installed by Ecofit Energy Systems Summer 2015

Raglan1.jpg        Gowerton.jpg       raglan 3.jpg

Design and installation of a complete Underfloor Heating system, with a total floor area of 2,000 square metres; and including floor insulation, vapour barrier, actuators and system controls, with an 80mm floor screed. Our insulation, Underfloor and screed package provides complete heating coverage for all areas of the new school.


Ecofit Energy Systems designed and installed a Tacker Sheet system with sealed PE vapour barrier, installed within the new screeded floor. Giacomini manifolds, actuators, and 16mm PE-Xb underfloor heating pipework were selected for the installation; together with tamperproof room thermostats and 230 volt manifold control units.


Giacomini packaged underfloor system was selected for this project as the pipework system is covered by the manufacturer’s 50 year guarantee and the local Giacomini Technical Sales office offers excellent support and technical backup.  

 

Mechanical Contractor Interserve
Main Contractor Lorne Stewart
Client Swansea City Council
   

 

case-study-footer-general.jpg