6 kW Wind Turbine installation at Cefn Parc Farm, Bridgend

case-study-header.jpg

case-study-wind-turbine-Cefn-Parc.jpg

Design and installation of a Kingspan KW6 6kw wind turbine at Cefn Parc Farm, Bridgend. The installation included positioning and erection of the Kingspan machine, and a 400 metre run of electrical cable back to the farm distribution board via a Windyboy 6000 inverter. Grid connection is via a single phase KW HR A11 meter.

 

Main Contractor CMB Renewables, Neath
Client Mr T Thomas, Cefn Parc Farm

 