Design and installation of a 4 kW Solar Photovoltaic system, on slab ballasted “Solar Steel” non penetrative support system, with 16 x Upsolar Polycrystalline 250 watt UP-M250P panels. Upsolar panels are manufactured to the highest standards of quality and performance, and are rated as Tier 1. The panels are connected in two strings to an SMA inverter mounted in the garage area, and connection back to the distribution board is via an L&G single phase
generation meter.

The system was designed and installed in accordance with MIS 3002.

MCS Electrical Contractor Atom Electrical, Swansea
Main Build Contractor Blue Yonder
Design Consultant Richards Partnership, Swansea
Client Mr Rob Willis

 